Procore Company Logo
    • Europe & Middle East
    • Deutschland (Deutsch)
    • France (Français)
    • United Arab Emirates (English)
    • United Kingdom (English)
Request a DemoLog InRequest a Demo
Request a Demo
cta-construction-image

See what’s coming in construction over the next decade.

Download the Future State of Construction Report for insights, trends, and innovations shaping the industry over the next 8–10 years.

Download now

—  4 min read

4D BIM: Merging Building Information Modelling with Scheduling

By

Last Updated Jul 25, 2025

By
Construction BIM model on a laptop

Humans have long speculated about the fourth dimension, but the UK architecture, engineering and construction (AEC) sector already puts it to work. By overlaying time on top of 3D Building Information Modelling (BIM), 4D BIM transforms static models into data-driven construction programmes that anyone can visualise and interrogate.

When teams apply 4D BIM effectively, main contractors, BIM specialists and project managers translate complex schedules into clear simulations that drive safer, faster and more profitable delivery.

Table of contents

Understanding 4D BIM

Simply put, 4D BIM combines a 3D BIM model with the fourth dimension: time. By fusing geometric data and scheduling data, it produces a dynamic visual simulation of the construction process.

The "time" layer includes these key elements:

  • Construction schedules (planned start/finish dates)
  • Task durations and dependencies
  • Resource allocation (plant, labour, materials)
  • Logistics plans (delivery routes, storage zones, access/exit)

Rather than deciphering Gantt charts or spreadsheets, teams can simulate these data against model elements to see the project's progression day-by-day or week-by-week.

Key Benefits

Using a model enriched with programme data unlocks several notable advantages for projects:

  • Enhanced Planning and Scheduling 

    Visual sequencing exposes clashes and inefficiencies before they reach site, helping planners comply with BS EN ISO 19650 information-management standards.

  • Stronger Collaboration and Communication

    A single simulated programme aligns clients, designers, main contractors and subcontractors, reducing misunderstandings and speeding up approvals.

  • Reduced Risks and Errors 

    Early detection of sequencing conflicts minimises rework, delay claims and cost overruns under NEC or JCT contracts

  • Better Resource Management 

    Teams can time plant, labour and material deliveries precisely – essential when a crane at £3,000+ per day is on the critical path.

  • Improved Safety 

    Seeing the work sequenced in 3D helps teams pinpoint where tie-offs, edge protection, or exclusion zones are required, supporting duties under the Construction (Design and Management) Regulations 2015.

  • More Effective Progress Monitoring 

    Monthly – or even weekly – updates let teams compare planned versus actual dates, enabling rapid recovery actions and more robust earned-value reporting.

Implementing 4D BIM

Creating a 4D model can be labour-intensive, so most teams wait until two assets exist:

  1. Detailed Construction Programme

    Asta Powerproject, Primavera P6 or Microsoft Project - with durations, dependencies and resource codes.

  2. Coordinated 3D Model

    Compiled by the design team, the main contractor’s BIM department and key trade contractors, all stored in a Common Data Environment.

The BIM lead then links schedule line-items to model objects – manually or via rule-based automation – inside a 4D platform. Once linked, users can move through time to see installation sequencing, test logistics plans, or export a video for the next board meeting.

However, determining what to simulate depends on the project. Few teams model every nut and bolt; instead, they focus on high-risk or high-value areas such as structural steel, complex MEP zones or façade installation on a tight urban site. During pre-construction, a "massing" 4D model of these areas can even help win the job by showcasing the contractor's capability.

Maintaining Data Flow

Regular coordination sessions keep data flowing effectively. If information becomes siloed in one person's software, the model quickly turns stale and loses its value as a planning and problem-prevention tool. Company-led training helps planners and site managers overcome the learning curve, while an enforceable BIM Execution Plan – specifying authoring tools, open standards (IFC, COBie) and naming conventions – protects against data loss when files move between platforms.

BIM Dimensions in Context

BIM dimensions build on one another systematically:

  • 3D – geometry
  • 4D – time (construction sequencing)
  • 5D – cost (estimates, cash flow, earned value)

Although 5D adoption is still emerging in the UK, mastering 4D lays the groundwork. When teams trust time-based data, linking cost becomes a logical next step – and some major frameworks are already piloting carbon (6D) and facilities-management (7D) data layers to support Net-Zero and Digital-Built-Britain ambitions.

Software Considerations

Authoring tools generate the geometric data; scheduling tools create the temporal data; specialised 4D platforms fuse the two and host cloud-based viewers so anyone can interrogate the model from the site cabin or the boardroom.

Whatever software teams choose, the fundamentals remain the same: accurate inputs, robust integrations and disciplined information management. Selecting software with native APIs – or mandating them in the BIM Execution Plan – minimises re-work and keeps the focus on building, not data wrangling.

Why 4D BIM Matters Today

Taken together, these elements explain why 4D BIM is an essential capability for forward-looking UK contractors and clients alike. By transforming static 3D geometry into a living, time-based model, organisations gain a clearer line of sight into programme feasibility, resource demand, and site safety, while providing every stakeholder – from the managing director to the newest apprentice – with a common, visual language for decision-making.

Projects that embed 4D practices early consistently report fewer surprises, faster approvals, tighter cost control and measurably safer working environments. Importantly, success does not depend on cutting-edge technology; it rests on accurate models, robust schedules, committed leadership and a culture of regular, multidisciplinary collaboration.

Firms that invest now in the right tools, skills and information governance will find themselves ideally positioned when the industry mainstreams 5D cost modelling, 6D carbon dashboards and 7D asset handover. In short, 4D BIM is not merely a digital add-on – it’s the strategic bridge to a more predictable, sustainable and profitable future for UK construction.

Categories:

Preconstruction, Project Management, Resource Management, Tech and Data

Tags:

Written by

Nicholas Dunbar

59 articles

Nick Dunbar oversees the creation and management of UK and Ireland educational content at Procore. Previously, he worked as a sustainability writer at the Building Research Establishment and served as a sustainability consultant within the built environment sector. Nick holds degrees in industrial sustainability and environmental sciences and lives in Camden, London.

View profile

Zoe Mullan

27 articles

Zoe Mullan is an experienced content writer and editor with a background in marketing and communications in the e-learning sector. Zoe holds an MA in English Literature and History from the University of Glasgow and a PGDip in Journalism from the University of Strathclyde and lives in Northern Ireland.

View profile

Explore more helpful resources

article-image

How to Execute Timely & Accurate Construction Buyouts

A construction buyout is the critical procurement phase that bridges preconstruction planning and full-site mobilisation. During this phase, main contractors (MCs) competitively select subcontractors, negotiate final agreements, and issue purchase...

article-image

Work Breakdown Structure (WBS) in Construction: A Detailed Guide

Effective planning and control sit at the heart of every successful construction project. Among the many tools available, the Work Breakdown Structure (WBS) provides a clear, visual way to capture...

article-image

Construction Meeting Minutes Template: (Guide & Free Download)

Construction meetings help contractors share information with other stakeholders and get ideas on driving the project forward. To reap all the benefits from construction meetings, project managers need to be...

article-image

Managing Construction Risk: Who’s Really Accountable?

Risk is inherent in construction work – something that few construction professionals need reminding of. However, the construction industry currently suffers from a critical education gap: people don’t truly understand...

Procore is committed to advancing the construction industry by improving the lives of people working in construction, driving technology innovation, and building a global community of groundbreakers. Our connected global construction platform unites all stakeholders on a project with unlimited access to support and a business model designed for the construction industry.

LinkedIn Icon
LinkedIn
Facebook icon
Facebook
Twitter icon
Twitter
Instagram Icon
Instagram
YouTube icon
YouTube

Call us at (+44) 0800 368 7703 to speak with a product expert.

Apple LogoApple App StoreGoogle Play logoGoogle Play

Downloads

Apple LogoApple App StoreGoogle Play logoGoogle Play
  • Privacy Notice
  • Terms of Service

© 2025 Procore Technologies, Inc.