Procore Company Logo
    • Americas
    • América Latina (Español)
    • Canada (English)
    • Canada (Français)
    • United States (English)
Request a demoLog InRequest a demo
Request a demo
Lakeridge_JHS_Hero

Project Story

Building a sustainable future with innovative construction

The new Lakeridge Middle School project utilized Procore to enhance learning environments for 1,100 students

Lakeridge_JHS_Hero

The Lakeridge Middle School was a new, multi-phased school construction project that included:

  • Demolition of the existing school and installing temporary classrooms, restrooms and a gymnasium

  • Construction of a new 138,000-SF middle school to accommodate 1,100 students, complete with new sitework, bus drop-off, parking and offsite improvements

  • A design and build to accommodate future green energy solar panel array

  • Passive ventilation system and integrated smart technology to signal teachers/students when to open and close windows to maximize natural heating/cooling elements

  • A courtyard designed to emulate the underwater vortexes created during the Great Missoula Flood, forming most of the Willamette Valley

  • 29 local trees harvested local and repurposed by Whole Trees as structural columns throughout the school

Photos Courtesy of Josh Partee
Construction site with cranes and buildings under a clear blue sky

Quantifying the Value of Construction Management Software

Inside the 2025 Dodge & Data Analytics ROI report

Ready to see it in action?

Stop jumping between apps to get a clear view of your project’s status.

4.5(2,639)

4.6(3,941)

4.7(41K)

4.1(3,050)