Lakeridge_JHS_Hero

Project Story

Building a sustainable future with innovative construction

138,000 square feet. $68,600,000. 1,100 students

Lakeridge_JHS_Hero

The Lakeridge Middle School was a new, multi-phased school construction project that included:

  • Demolition of the existing school and installing temporary classrooms, restrooms and a gymnasium

  • Construction of a new 138,000-SF middle school to accommodate 1,100 students, complete with new sitework, bus drop-off, parking and offsite improvements

  • A design and build to accommodate future green energy solar panel array

  • Passive ventilation system and integrated smart technology to signal teachers/students when to open and close windows to maximize natural heating/cooling elements

  • A courtyard designed to emulate the underwater vortexes created during the Great Missoula Flood, forming most of the Willamette Valley

  • 29 local trees harvested local and repurposed by Whole Trees as structural columns throughout the school

Photos Courtesy of Josh Partee
Two construction workers supervising a site

Report: The Future State of Construction

See the trends driving the next decade of construction.

Ready to see it in action?

Trusted by UK builders to manage budgets, crews and schedules — in FEWER hours

4.5(2,642)

4.6(3,964)

4.7(41K)

4.1(3,060)