View content specific to your region: Country flag United States Change Location
Request a Demo
Quality and Safety Procore Quality and Safety Logo

Detailed Observations

See anything? Track everything.

Learn More

Quality and Safety Procore Quality and Safety Icon

Never let an observation fall through the cracks.

Whether a non-conformance, safety violation or good practice, track, assign and report upon multiple types of construction observations on the fly before substantial completion.

  • Create observations as a stand alone item or from an inspection or drawing, whether in the office or out in the field
  • Attach supporting documentation such as photos, drawings and links to specs
  • Keep your observations separate from your substantial completion items managed in the Snag List tool
  • Identify snag list Items associated with your observation
  • Assign a responsible party and due date
  • Manage your observations through completion, maintaining real-time history of actions
  • Setup automatic overdue emails to keep responsible parties on track

  • Keep Your Snag List Separate

    The Observations tool allows you to identify and track multiple types of issues outside of your snag list items.

  • Identify Your Field Observations – in the Field

    Field observations should be noted where you find them – in the field. Create an observation as you come across one or create one from a pre-planned Inspection. All observations will be streamlined into one list, but can be filtered based on your requirements.

  • Track Contractor Performance

    Identify which tasks are critical and track them to completion – giving you access to performance records for each contractor and/or team member.

  • Monitor Progress with Due Dates

    Procore construction project management software automatically monitors due dates and sends overdue email notices if desired. The overdue email notices help keep items from falling out of sight and clearly note when an item's due date has passed.

  • Attach Detailed Information for Reference

    Every observation can include documents and digital photos, there's also a handy text area for adding details about the observation. Users can type in details, cut and paste text from other applications or dictate text (if your mobile tablet allows). Now you'll have the ability to add extensive formatting and even perform spell check in the observation description field.

"Procore is exactly what we needed to standardise how we do things the HITT way."

Jim Landefeld
HITT Contracting

Close Button

Experience the most widely used construction platform.

Fill out the form and a Procore expert will contact you shortly to schedule a quick walkthrough of the platform.

Streamline communication and centralize your documentation with our best-in-class PM solution.

All the tools to help you baseline, trend, and improve your quality and safety processes.

Empower project teams in the field with the tools to maximize profits using an all-in-one financial management solution.

Make decisions that positively impact your budget and schedule with real-time labor productivity reporting.

Hear from our customers - 2 minute video

Request a Demo