Request a DemoLog In1800 431 456
    • Asia Pacific
    • Australia (English)
    • Singapore (English)
Request a DemoLog In

—  7 min read

Understanding the 6 Phases of Project Management in Construction

By 

Last Updated Nov 5, 2024

By

Last Updated Nov 5, 2024

Photo of architect on future construction site during the predevelopment phase deciding on site feasibility

Construction projects are like no other. Each one is unique, having different participants, variable conditions and one-off requirements. But across them all, you’ll find construction project phases are strikingly similar.

Table of contents

Importance of Construction Project Management Phases

The phases of a construction project move on a linear timeline. Without them, you’d be left with no guiding structure for the project.

Project Design

The construction phases of a project’s life cycle begins with its design. Here, the owner builds the case for constructing the project. Sometimes, after all is considered, the owner might find the project is not workable.

Business Case Document

Whether it’s a high-rise office building or a low-rise multifamily housing project, owners must always satisfy a business case for the project. In this part of the design phase, the owner envisions the property’s use and the financial incentives for that use.

Feasibility Study

The feasibility study either convinces the owner the project is possible, flags it as needing adjustments, or shows it as a no go. In this part of the design phase, the owner considers variables ranging from land use to construction costs while fine-tuning the best use. If the project is deemed possible, then it moves into the next phase.

Define Scope

In the scoping phase, the owner works closely with architects, engineers and sometimes even contractors to decide the project size and features. The goal is to match the finished project to its immediate use after construction and to accommodate additional uses as the project ages. At this phase, the design team renders all the drawings and specifications needed to build the project.

Project Procurement

With the project plans completed, the owner moves the project to the next phase. In this second of the construction project phases, the goal is to assemble the team that will do the construction.

Project Procurement

With the project plans completed, the owner moves the project to the next phase. In this second of the construction project phases, the goal is to assemble the team that will do the construction.

Select Delivery Method

A prime consideration is the delivery method. Until the last decade, owners almost always chose the design-tender-build delivery method. Today, more and more projects are opening up to design-build and integrated project delivery. These collaborative methods lead to lower costs and better project outcomes. The owner chooses the delivery method that will best fulfil the project’s goals.

Select Participants

The owner often selects project participants by inviting contractors or construction managers to tender on the project. Sometimes the owner may already have a working relationship with particular contractors, like is often the case with corporate owners, so they will invite them to the project. Sometimes contractors submit hard tenders to win the project, while other times, the contractors and owners work together to design and price the project. In all cases, the owner is trying to achieve the best value for the money while rendering the project as close to their original intent as possible.

Award Contracts

Awarding contracts is the last part of this construction project phase. The owner must weigh multiple factors in selecting the builder. Price is a top consideration, but the builder’s track record, its ability to insure and bond for the project and the builders’ experience with similar projects all figure into the decision.

Project Preconstruction

With contracts signed, the head contractor, or construction manager, gets to work on all details needed to start construction. First, they must round out the required help. Most HCs and CMs will come to the job with a group of subcontractors already known to them. However, speciality aspects to the project often require them to locate and partner with specialists. The HCs and CMs spend much time at this phase bringing people, materials and equipment together, and planning everything out.

Obtain Permits

Few localities exist where you don’t need permits for construction. Contractors get to work pulling permits for everything from utility work to building code requirements.

Site Survey

Contractors consult site surveys to confirm their understanding of what already exists on the construction site. These surveys often find conditions that weren’t included in the contract documents. This is the first opportunity contractors have to record and begin managing the inevitable surprises inherent in any construction project.

Create a Risk Management Plan

Almost all contracts today require the contractor to have a formal risk management plan. The contractor must assess all the project risks and make plans for eliminating them, controlling them or insuring against them. Besides protecting the owner, these plans help the contractor foresee and avoid surprise costs arising from risks. 

Set up a Safety Plan

While safety is also a risk item on construction projects, contractors usually deal with it separately because safety risks are so far-reaching. They often involve life and death, so contractors want to make them a top priority. 

Create Work Breakdown Structures

Contractors break construction projects into activities and tasks. Activities are the units of construction, like pouring the foundation. Tasks are the steps needed to pour the foundation. The work breakdown structure lists all the tasks needed for each activity. Many construction projects have thousands of activities, so the WBS creates a clear roadmap from project start to project end.

Design Project Program

It’s project managers and programmers’ job to turn the WBS into a program that site teams can follow. The program reflects the longest time to project completion. It includes milestones so managers can assess how well the project is hitting its program. 

Set Up Communications Plan

Construction contracts often require contractors to have a communications plan that meshes with the project comms plan. Here, the contractor specifies how required and time-sensitive communications should take place. They also include accountability controls so parties to the contract know their responsibilities for communicating project information.

Project Execution

The fourth phase is where all the earlier work gets validated, or not. 

Preconstruction Meetings

Contractors kick off the project with preconstruction meetings. During these meetings, all the parties review the project so they understand their roles and how they fit into the wider project.

Resource Procurement

HCs and speciality contractors buy and order all the materials, parts and equipment needed for their portions of the work. They also set up their site teams and labour management plans.

Start Activities

This part of the project execution phase is where the physical work begins. Contractors take virtual, or 2D plans, and turn them into 3D.

Project Control

Without controls, construction projects can get gravely sidetracked. There are too many moving parts and too many variables to operate without controls.

Track Work

Once construction is underway, this is the most important of the construction project management phases. Without adequate tracking, it’s very easy to lose control of the activities. This is where many PMs rely on web-based construction management software because it’s always on and has the most recent project information.

Track Activities Against Time Objectives

Each construction program sets a time limit for each activity. Getting done early is sometimes as bad as getting done late, so project managers want to see how closely site teams are hitting the scheduled times.

Track Quality of Activities and Tasks

Rework and variations fill the day without quality checks. Each task must meet the assigned quality. Otherwise, tasks coming after can also miss the quality mark.

Adjust Program

As project managers pour over the times and quality aspects of projects, they sometimes must adjust the program to reflect the project’s latest trajectory.

Track Budget

All parties working on the project have their own budgets to track. However, the HC or CM must also track the overall project budget. If the budget looks like it might start running in the red, the HC or CM must find the reason, and quickly.

Project Closure

No matter its length, by the time people get to the last of the project’s construction phases, they are eager to get through the final troubling details.

Defect List

The defect list shows all the problems with the job that must get corrected before close out. Site teams work on the portions of the defect list that match their specialities.

Commissioning

For projects involving buildings, this close out aspect certifies that all the equipment and systems work properly.

Budget Close Out

Closing out the budget means that everybody can get paid the final monies owed to them. If the owner and HC have withheld retention, then this lump sum also comes due.

Conclusion

It’s no coincidence the early construction project phases are more mired in detail than the later ones. Wise owners and contractors have figured out that an ounce of planning can cancel out many pounds of rework and mistakes. The construction project phases provide the framework for well-planned projects.

Categories:

Tags:

Written by

Emma De Francesco

17 articles

Emma is currently Strategic Product Consultant at Procore where she loves partnering with clients to help them achieve the best possible results. She has worked as a Project Manager in previous roles, responsible for overseeing small to medium-sized projects across various sectors including commercial, health and lifestyle, retail, government and hotels. Throughout these projects, she managed everything from project costs, program and quality & safety, to design management, procurement, and authority approvals.

View profile

Explore more helpful resources

article-image

Submittals in Construction: What They Are and How To Manage Them

As a crucial link in the project paper trail, submittals are something everyone has to deal with. They lay the foundations for successful delivery, provide evidence trails for who decided...

article-image

Quality Assurance: Improving Safety and Efficiency in Construction

Quality assurance (which differs from quality control) works to prevent quality issues before they pop up, helping you run a more effective and profitable construction firm. In this article, we...

article-image

How Performance Bonds Mitigate Risk in Construction Projects

A performance bond provides a guarantee that a contractor will fulfil all of their obligations under a construction agreement. Performance bonds are a subset of contract bonds, in the sense...

article-image

Understanding Building Specifications – Driving Project Success

Building specifications are the crux of a construction project, capturing every critical detail and requirement that brings a project to life. As a key component of the initial contract agreement,...

Procore is committed to advancing the construction industry by improving the lives of people working in construction, driving technology innovation, and building a global community of groundbreakers. Our connected global construction platform unites all stakeholders on a project with unlimited access to support and a business model designed for the construction industry.

LinkedIn Icon
LinkedIn
Facebook icon
Facebook
Twitter icon
Twitter
Instagram Icon
Instagram
YouTube icon
YouTube

Call us at 1800 431 456 to speak with a product expert.

Apple LogoApple App StoreGoogle Play logoGoogle Play

Downloads

Apple LogoApple App StoreGoogle Play logoGoogle Play
  • Privacy Notice
  • Terms of Service
  • Australia Privacy

© 2024 Procore Technologies, Inc.