Construction Scheduling Contractors in Kermit, TX

2,808 Results within

Construction Scheduling
Project Management and Coordination
Clear All Filters
Market Sector
Company Type
Business Classification
Trades and Services (2)

Super Structures General Contractors, Inc.

Alabama • Alaska • Arizona • Arkansas • Florida • Georgia • Louisiana • Mississippi • Nevada • New Mexico • North Carolina • Oregon • South Carolina • Tennessee • Texas • Utah • Virginia • West Virginia
General Contractor
Commercial, Healthcare, Industrial and Energy, Infrastructure, Institutional, Residential
Architectural Design and Engineering, Athletic and Recreational Special Construction, Batten Seam Sheet Metal Wall Cladding, Building Modules and Components, Civil Design and Engineering, Concrete, Construction Scheduling, Demolition, Design and Engineering, Design Coordination Services, Electrical Design and Engineering, Estimating, Fabric Structures, Fabricated Engineered Structures, Fabricated Faced Panel Assemblies, Fabricated Panel Assemblies With Siding, Fabricated Rooms, Fabricated Wall Panel Assemblies, Faced Panels, Flat Seam Sheet Metal Wall Cladding, General Construction Management, Mechanical Design and Engineering, Metal Faced Panels, Metal Support Assemblies, Metal Wall Panels, Preconstruction Bidding, Project Management, Project Management and Coordination, Sheet Metal Roofing, Sheet Metal Wall Cladding, Stainless Steel Framed Entrances and Storefronts, Standing Seam Sheet Metal Wall Cladding, Steel Framed Entrances and Storefronts, Structural Steel, Structural Steel Framing Erection, Structural Steel Framing Fabrication, Structure and Building Moving Relocation, Structure Demolition, Wall Panels, Wall Specialties
Established in 1990 by the Gallier family to offer services such as Design-Build General Contracting, Pre-Engineered Metal Building, Building Envelope, Conventional Construction, Modular Construction, Pre-Constructions Services, Support Services, Construction Management and Project Management. Super Structures is a preferred vendor provider for the following building systems: Metallic Building Systems, Kirby Building Systems, American Metal Buildings and is capable of working in the following states: Texas, Alabama, Arkansas, Arizona, Georgia, Mississippi, South Carolina, Florida, Louisiana, Nevada, New Mexico, North Carolina, Oregon, Tennessee, Utah, Virginia, West Virginia and the Virgin Island.

Midwestern Millwright

California • Colorado • Iowa • Missouri • Nebraska • South Dakota • Texas
Engineer, General Contractor
Commercial, Industrial and Energy
Building Information Modeling Bim, Bulk Material Processing Equipment, Cast In Place Concrete, Cast In Place Concrete Retaining Walls, Civil Design and Engineering, Concrete, Concrete Finishing, Construction Scheduling, Curbs Gutters Sidewalks and Driveways, Design and Engineering, Driveways, Earthwork, Equipment, Equipment Rental, Estimating, Excavation and Fill, Expanded Metal Fences and Gates, Fabricated Engineered Structures, Foodservice Equipment, Forming, General Construction Management, Grading, Grouting, Industry Specific Manufacturing Equipment, Metal Countertops, Metal Fabrications, Metal Support Assemblies, Metals, Plumbing General, Plumbing Utilities Distribution, Process Piping, Project Management, Project Management and Coordination, Reinforcement Bars, Sheet Metal Flashing and Trim, Special Structures, Structural Steel, Structural Steel Framing Erection, Structural Steel Framing Fabrication, Temporary Cranes, Transportation Construction and Equipment, Transportation Equipment, Trucks
Midwestern Millwright is a Engineer, General Contractor that serves the Fort Morgan, CO area and specializes in Temporary Cranes, Bulk Material Processing Equipment, Fabricated Engineered Structures, Excavation and Fill, Metals, Estimating, Driveways, Process Piping, Metal Support Assemblies, Grouting, Reinforcement Bars, Design and Engineering, Project Management and Coordination, Cast In Place Concrete Retaining Walls, Grading, Trucks, Transportation Equipment, Special Structures, Concrete, Equipment, General Construction Management, Earthwork, Concrete Finishing, Civil Design and Engineering, Forming, Structural Steel, Construction Scheduling, Curbs Gutters Sidewalks and Driveways, Foodservice Equipment, Structural Steel Framing Fabrication, Equipment Rental, Building Information Modeling BIM, Metal Countertops, Metal Fabrications, Project Management, Transportation Construction and Equipment, Industry Specific Manufacturing Equipment, Cast In Place Concrete, Expanded Metal Fences and Gates, Plumbing General, Structural Steel Framing Erection, Sheet Metal Flashing and Trim, Plumbing Utilities Distribution.
Company Logo

Jacobs ADS, Registered Limited Liability Partnership

Arnold Air Force Base, TN • Colorado Springs, CO • Fort Campbell, KY • Fort Knox, KY • Lexington, KY • Millington, TN • Alabama • Alberta • Georgia • Indiana • Ohio • Texas • Utah
Architect, Consultant, Engineer, General Contractor, Specialty Contractor
Commercial, Healthcare, Industrial and Energy, Infrastructure, Institutional, Residential
Communications, Concrete, Demolition, Design and Engineering, Earthwork, Electrical, Project Management and Coordination, Roofing, Structural Steel
Capabilities Statement Company Overview Agile Defense Systems (ADS) is a Veteran-Owned, Disadvantaged Small Business Contractor with over 15 years of proven experience in government procurement and contracting. We specialize in delivering high-quality, comprehensive solutions for projects that demand speed, precision, and performance-based processes. Our commitment to client-centric relationships, competitive pricing, and precision ensures that we consistently meet and exceed project objectives and timelines. Core Competencies Pre-Construction Services: Accident Prevention Plans Waste Management Plans Pre-construction Submittals Environmental Submittal Preparations Project Management CPM Scheduling (Microsoft Project, Primavera P6) Contractor Quality Control Programs Contracting: Proposal Development Procurement Strategies Partnering and Teaming Contract Strategy Management Contract Life Cycle Management Building Construction: Design-Build Services Facility Renovation and Upgrades Safety and Compliance Management Project Scheduling and Management Cloud & IT Solutions: Custom Cloud Solutions IT Infrastructure Management Cybersecurity IT Project Management Systems Integration Differentiators Expert Leadership: Spearheaded by Devin Davis, a Defense Acquisitions University graduate and Certified Systems Engineering Professional, with PMP and Google Cloud Architect certifications. Speed & Precision: ADS excels in mobilizing top-tier talent and cutting-edge technologies to ensure timely and accurate project execution. Client-Centric Approach: We prioritize transparency, flexibility, and responsiveness, ensuring that client needs are consistently met. Technological Innovation: Our solutions leverage the latest advancements in technology, ensuring optimal performance and security. Past Performance Crane Naval Surface Warfare Base (2017-2022) - Construction Management Air Force Academy Welcome Center (2022-2023) - Design Build & Project Management Bluegrass Army Depot (2021-2022) - Systems Integration Milan Army Ammunition Plant (2019-2020) - Project Management Lake Barkley Powerhouse (2013-2014) - Roofing Project Arnold Air Force Base (2010-2017) - MATOC Building Alterations Key Commercial Projects: Facebook Data Centers (2019) - Quality Control Manager (Building Envelope) Google Data Centers (2018-2019) - Project Manager (Site Control, Temporary Roads, Crane Pads) NAICS Codes 236220: Commercial and Institutional Building Construction 541330: Engineering Services 541511: Custom Computer Programming Services 541512: Computer Systems Design Services 541513: IT Infrastructure Services 541519: Other Computer Related Services 541611: Administrative Management and General Management Consulting Services 541618: Other Management Consulting Services 541690: Other Scientific and Technical Consulting Services 561210: Facilities Support Services 562910: Remediation Services CAGE Code: 9HUP5 UEI: QZ9VB2FJZ5D3 GC License No: 2012 615855 00 CL Contact Information Devin Phillip Davis, Founder Email: info@jacobsgroup.com Mobile: 859-397-0227 Address: 861 Corporate Dr. Ste 208, Lexington, KY 40503
Company Logo

Construction Management Consultant

California • Florida • Georgia • New Mexico • New York • Tennessee • Texas
Consultant, Engineer
Commercial, Healthcare, Industrial and Energy, Infrastructure, Institutional, Residential
3d Capture Scanning, Architectural Design and Engineering, Building Information Modeling Bim, Concrete, Demolition, Design Coordination Services, General Construction Management, Project Management, Project Management and Coordination
VIRUCON is a full-service construction consulting firm, dedicated to empowering our clients with innovative solutions and precision-driven project execution. Our services span a wide range of sectors, supporting private developers, public entities, contractors, and multinational firms. From Building Information Modeling (BIM) and advanced project planning to comprehensive construction management, we provide the expertise needed to drive project success. Our multidisciplinary team brings global insight and deep industry knowledge, ensuring that each project benefits from the latest technological advancements and best practices. We work relentlessly to expand our capabilities, aiming to be your firm of choice for integrated construction solutions. At VIRUCON, we believe in building lasting partnerships with our clients, delivering value through case-specific methodologies and cutting-edge tools. Whether managing large-scale infrastructure projects or realizing ambitious architectural visions, we combine technical excellence with a client-first approach to deliver superior results.
Company Logo

Interiors by Design

Bethesda, MD • Chevy Chase, MD • McLean, VA • New York, NY • Potomac, MD • Silver Spring, MD • Washington, DC • Alabama • Arizona • Arkansas • California • Colorado • Connecticut • Delaware • Florida • Georgia • Hawaii • Idaho • Illinois • Indiana • Iowa • Kansas • Kentucky • Louisiana • Maine • Maryland • Massachusetts • Michigan • Minnesota • Mississippi • Missouri • Montana • Nebraska • Nevada • New Brunswick • New Hampshire • New Jersey • New Mexico • New York • North Carolina • North Dakota • Ohio • Oklahoma • Oregon • Pennsylvania • Rhode Island • South Carolina • South Dakota • Tennessee • Texas • Utah • Vermont • Virginia • Washington • West Virginia • Wisconsin • Wyoming
Consultant, Specialty Contractor, Supplier
Commercial, Institutional, Residential
Furnishings, Furniture, Interior Design, Interior Specialties, Louvers, Project Management, Project Management and Coordination, Window Treatments
Interiors By Design Inc. (IBD) is a small boutique design firm with a full range of design experience in both renovations and new construction, as well as in creating custom furnishings and décor. Led by award-winning designer Dennese Guadeloupe Rojas, this Silver Spring, MD–based firm works on a global scale on residential, commercial, and multi-family projects. Rojas’ team of five takes pride in a positive environment of learning together and contributing to each design. IBD is known for uniquely weaving together reflections of the client’s taste and lifestyle with upscale touches and a curated feel. A well-executed interior includes an interesting mix of layers, finishes, and textures, with underlying notes of simplicity and class. Whatever style is desired, the final result is always distinctive and timeless. Everyone has a different vision of home. To discover that exact look, the IBD team has a concierge approach to collaborating with each client to glean what they truly want out of their space. Through the design process, the designers discover how to turn a space into the client’s definition of comfort—whether that’s through a soft palette, pops of color, or a design centered around a focal art piece. The ultimate goal is to create a space that not only echoes clients and their lifestyle but also enriches their lives. We start with an extensive client review that considers how clients live and want to spend their time, as well as their personal taste and style. IBD’s goal is to build a relationship with each homeowner and their project, so that we can develop a meaningful perspective into the client’s needs and aspirations. IBD likens ourselves to artists: each member of the team has a part in taking the client’s ideas and elevating them in their own creative interpretation. Our designs envelop all who enter, inspiring them to linger and imagine.
Company Logo

K&H Construction, Inc.

Alabama • Georgia • Illinois • Indiana • Iowa • Kansas • Kentucky • Louisiana • Maryland • Michigan • Mississippi • Missouri • New York • North Carolina • Ohio • Oklahoma • Pennsylvania • Tennessee • Texas • Virginia • West Virginia • Wisconsin
General Contractor
Commercial, Healthcare, Industrial and Energy, Infrastructure, Institutional
Communications, Concrete, Demolition, Earthwork, Landscaping, Project Management and Coordination, Rough Carpentry, Structural Steel
Based out of Fort Wayne, Indiana, K&H Construction got our start building a new wireless communications system for the Michigan State Police in 2001. We have expanded our portfolio substantially since then. While our specialties are tower construction and horizontal directional drilling, our portfolio includes much more. We believe our people are our biggest asset. Our leaders all boast more than 30 years’ experience, and our entire team focuses on getting the job done safely and getting it done right – every time. We are perfectionists: We employ the best in the industry. Our leaders all boast more than 30 years’ experience, and our entire team focuses on getting the job done safely and getting it done right — every time. We deliver the best: We constantly strive to demonstrate our innovative and superior capabilities in the construction industry. Our specialties are wireless solutions and horizontal directional drilling, but our portfolio includes much more. We value our customers. (the tougher, the better): We like to partner, plan, and problem solve with each customer — from start to finish.

Frequently Asked Questions

How many Construction Scheduling contractors in Kermit, TX are on the Procore Construction Network?

There are currently 2,808 Construction Scheduling contractors in Kermit, TX on the Procore Construction Network.

How can I find and connect with Construction Scheduling contractors in Kermit, TX?

The Procore Construction Network allows you to search for Construction Scheduling contractors in Kermit, TX that meet your business needs. Most companies provide a phone number or website on their business page so you can easily connect with them.

How can Construction Scheduling contractors in Kermit, TX join the Procore Construction Network?

The Procore Construction Network is free and open to any businesses in the construction industry. Click Sign Up at the top of this page to submit your information and create your business page.

How do I know what areas Construction Scheduling contractors in Kermit, TX cover?

Most businesses listed on the Procore Construction Network have updated their service area. Select a business to view a service area map and find what other areas they work in.

How do I invite Construction Scheduling contractors in Kermit, TX on the Procore Construction Network to bid on projects?

The Procore platform offers a Bidding tool to Procore customers. If your company uses our Bidding solution, you can search and invite businesses on the Procore Construction Network directly from the Bidding tool. Not yet using Procore? Request a demo.

How many Construction Scheduling contractors in Kermit, TX are on the Procore Construction Network?

There are currently 2,808 Construction Scheduling contractors in Kermit, TX on the Procore Construction Network.

How can I find and connect with Construction Scheduling contractors in Kermit, TX?

The Procore Construction Network allows you to search for Construction Scheduling contractors in Kermit, TX that meet your business needs. Most companies provide a phone number or website on their business page so you can easily connect with them.

How can Construction Scheduling contractors in Kermit, TX join the Procore Construction Network?

The Procore Construction Network is free and open to any businesses in the construction industry. Click Sign Up at the top of this page to submit your information and create your business page.

How do I know what areas Construction Scheduling contractors in Kermit, TX cover?

Most businesses listed on the Procore Construction Network have updated their service area. Select a business to view a service area map and find what other areas they work in.

How do I invite Construction Scheduling contractors in Kermit, TX on the Procore Construction Network to bid on projects?

The Procore platform offers a Bidding tool to Procore customers. If your company uses our Bidding solution, you can search and invite businesses on the Procore Construction Network directly from the Bidding tool. Not yet using Procore? Request a demo.