Construction Scheduling Contractors in Texas

4,259 Results

Construction Scheduling
Project Management and Coordination
Clear All Filters
Market Sector
Company Type
Business Classification
Trades and Services (2)
Company Logo

RCM Technologies (USA) Inc.

Connecticut • Florida • Indiana • Massachusetts • New Hampshire • New Jersey • New York • Ohio • Pennsylvania • Texas • Virginia • West Virginia
Architect, Consultant, Engineer, General Contractor
Commercial, Healthcare, Industrial and Energy, Infrastructure, Institutional
Architectural Design and Engineering, Civil Design and Engineering, Design and Engineering, Electrical Design and Engineering, General Construction Management, Mechanical Design and Engineering, Project Management and Coordination, Structural Design and Engineering
RCM has designed hundreds of substations and switchyards worldwide for electric utilities, independent power producers and industrial installations from 2.3 kV to 765 kV. Our experience includes open-air and gas-insulated stations, both Greenfield sites and upgrades, and expansions of existing substations. RCM’s comprehensive services range from conceptual designs, cost estimates, and siting studies to physical design, grading and drainage design, protection and control engineering, foundation design, and preparation of complete specifications for material, equipment and construction. This extensive experience is applied to develop creative solutions for challenging projects, including innovative physical arrangements to accommodate space constraints and irregular site boundaries, enclosed substation designs compatible with urban environments, grading and drainage designs to comply with storm-water runoff and retention regulations, and integrating new control and protection systems into existing substations. RCM Engineering Energy Services offers diverse multi-disciplined solutions for energy infrastructure challenges for utility owners, independent power providers, commercial, and industrial clients. Our energy programs include Engineering, Procurement and Construction (EPC) or Engineering, Procurement and Construction Management (EPCM) contracts (or turnkey construction contracts) for your complex electrical infrastructure projects.

Super Structures General Contractors, Inc.

Alabama • Alaska • Arizona • Arkansas • Florida • Georgia • Louisiana • Mississippi • Nevada • New Mexico • North Carolina • Oregon • South Carolina • Tennessee • Texas • Utah • Virginia • West Virginia
General Contractor
Commercial, Healthcare, Industrial and Energy, Infrastructure, Institutional, Residential
Architectural Design and Engineering, Athletic and Recreational Special Construction, Batten Seam Sheet Metal Wall Cladding, Building Modules and Components, Civil Design and Engineering, Concrete, Construction Scheduling, Demolition, Design and Engineering, Design Coordination Services, Electrical Design and Engineering, Estimating, Fabric Structures, Fabricated Engineered Structures, Fabricated Faced Panel Assemblies, Fabricated Panel Assemblies With Siding, Fabricated Rooms, Fabricated Wall Panel Assemblies, Faced Panels, Flat Seam Sheet Metal Wall Cladding, General Construction Management, Mechanical Design and Engineering, Metal Faced Panels, Metal Support Assemblies, Metal Wall Panels, Preconstruction Bidding, Project Management, Project Management and Coordination, Sheet Metal Roofing, Sheet Metal Wall Cladding, Stainless Steel Framed Entrances and Storefronts, Standing Seam Sheet Metal Wall Cladding, Steel Framed Entrances and Storefronts, Structural Steel, Structural Steel Framing Erection, Structural Steel Framing Fabrication, Structure and Building Moving Relocation, Structure Demolition, Wall Panels, Wall Specialties
Established in 1990 by the Gallier family to offer services such as Design-Build General Contracting, Pre-Engineered Metal Building, Building Envelope, Conventional Construction, Modular Construction, Pre-Constructions Services, Support Services, Construction Management and Project Management. Super Structures is a preferred vendor provider for the following building systems: Metallic Building Systems, Kirby Building Systems, American Metal Buildings and is capable of working in the following states: Texas, Alabama, Arkansas, Arizona, Georgia, Mississippi, South Carolina, Florida, Louisiana, Nevada, New Mexico, North Carolina, Oregon, Tennessee, Utah, Virginia, West Virginia and the Virgin Island.
Company Logo

Construction Management Consultant

California • Florida • Georgia • New Mexico • New York • Tennessee • Texas
Consultant, Engineer
Commercial, Healthcare, Industrial and Energy, Infrastructure, Institutional, Residential
3d Capture Scanning, Architectural Design and Engineering, Building Information Modeling Bim, Concrete, Demolition, Design Coordination Services, General Construction Management, Project Management, Project Management and Coordination
VIRUCON is more than a service provider—we are your partner in driving construction excellence. Rooted in innovation and precision, we specialize in delivering bespoke solutions tailored to the dynamic needs of the construction industry. With a commitment to industry best practices and leveraging the latest advancements in technology, VIRUCON ensures optimal project outcomes for every client. Our multidisciplinary team of experts brings global insight and specialized expertise to every project. We excel in Building Information Modeling (BIM), advanced project planning, and construction management, enabling our clients across sectors—including private developers, public entities, and contractors—to achieve unparalleled efficiency and growth. VIRUCON’s case-specific methodologies and innovative tools empower organizations to navigate the complexities of modern construction. Whether shaping ambitious architectural visions or managing large-scale infrastructure projects, we combine cutting-edge technology with a client-first approach to deliver superior results.
Company Logo

Jacobs ADS, Registered Limited Liability Partnership

Arnold Air Force Base, TN • Colorado Springs, CO • Fort Campbell, KY • Fort Knox, KY • Lexington, KY • Millington, TN • Alabama • Alberta • Georgia • Indiana • Ohio • Texas • Utah
Architect, Consultant, Engineer, General Contractor, Specialty Contractor
Commercial, Healthcare, Industrial and Energy, Infrastructure, Institutional, Residential
Communications, Concrete, Demolition, Design and Engineering, Earthwork, Electrical, Project Management and Coordination, Roofing, Structural Steel
Capabilities Statement Company Overview Agile Defense Systems (ADS) is a Veteran-Owned, Disadvantaged Small Business Contractor with over 15 years of proven experience in government procurement and contracting. We specialize in delivering high-quality, comprehensive solutions for projects that demand speed, precision, and performance-based processes. Our commitment to client-centric relationships, competitive pricing, and precision ensures that we consistently meet and exceed project objectives and timelines. Core Competencies Pre-Construction Services: Accident Prevention Plans Waste Management Plans Pre-construction Submittals Environmental Submittal Preparations Project Management CPM Scheduling (Microsoft Project, Primavera P6) Contractor Quality Control Programs Contracting: Proposal Development Procurement Strategies Partnering and Teaming Contract Strategy Management Contract Life Cycle Management Building Construction: Design-Build Services Facility Renovation and Upgrades Safety and Compliance Management Project Scheduling and Management Cloud & IT Solutions: Custom Cloud Solutions IT Infrastructure Management Cybersecurity IT Project Management Systems Integration Differentiators Expert Leadership: Spearheaded by Devin Davis, a Defense Acquisitions University graduate and Certified Systems Engineering Professional, with PMP and Google Cloud Architect certifications. Speed & Precision: ADS excels in mobilizing top-tier talent and cutting-edge technologies to ensure timely and accurate project execution. Client-Centric Approach: We prioritize transparency, flexibility, and responsiveness, ensuring that client needs are consistently met. Technological Innovation: Our solutions leverage the latest advancements in technology, ensuring optimal performance and security. Past Performance Crane Naval Surface Warfare Base (2017-2022) - Construction Management Air Force Academy Welcome Center (2022-2023) - Design Build & Project Management Bluegrass Army Depot (2021-2022) - Systems Integration Milan Army Ammunition Plant (2019-2020) - Project Management Lake Barkley Powerhouse (2013-2014) - Roofing Project Arnold Air Force Base (2010-2017) - MATOC Building Alterations Key Commercial Projects: Facebook Data Centers (2019) - Quality Control Manager (Building Envelope) Google Data Centers (2018-2019) - Project Manager (Site Control, Temporary Roads, Crane Pads) NAICS Codes 236220: Commercial and Institutional Building Construction 541330: Engineering Services 541511: Custom Computer Programming Services 541512: Computer Systems Design Services 541513: IT Infrastructure Services 541519: Other Computer Related Services 541611: Administrative Management and General Management Consulting Services 541618: Other Management Consulting Services 541690: Other Scientific and Technical Consulting Services 561210: Facilities Support Services 562910: Remediation Services CAGE Code: 9HUP5 UEI: QZ9VB2FJZ5D3 GC License No: 2012 615855 00 CL Contact Information Devin Phillip Davis, Founder Email: info@jacobsgroup.com Mobile: 859-397-0227 Address: 861 Corporate Dr. Ste 208, Lexington, KY 40503

Top Cities in Texas

Frequently Asked Questions

How many Construction Scheduling contractors in Texas are on the Procore Construction Network?

There are currently 4,259 Construction Scheduling contractors in Texas on the Procore Construction Network.

How can I find and connect with Construction Scheduling contractors in Texas?

The Procore Construction Network allows you to search for Construction Scheduling contractors in Texas that meet your business needs. Most companies provide a phone number or website on their business page so you can easily connect with them.

How can Construction Scheduling contractors in Texas join the Procore Construction Network?

The Procore Construction Network is free and open to any businesses in the construction industry. Click Sign Up at the top of this page to submit your information and create your business page.

How do I know what areas Construction Scheduling contractors in Texas cover?

Most businesses listed on the Procore Construction Network have updated their service area. Select a business to view a service area map and find what other areas they work in.

How do I invite Construction Scheduling contractors in Texas on the Procore Construction Network to bid on projects?

The Procore platform offers a Bidding tool to Procore customers. If your company uses our Bidding solution, you can search and invite businesses on the Procore Construction Network directly from the Bidding tool. Not yet using Procore? Request a demo.

How many Construction Scheduling contractors in Texas are on the Procore Construction Network?

There are currently 4,259 Construction Scheduling contractors in Texas on the Procore Construction Network.

How can I find and connect with Construction Scheduling contractors in Texas?

The Procore Construction Network allows you to search for Construction Scheduling contractors in Texas that meet your business needs. Most companies provide a phone number or website on their business page so you can easily connect with them.

How can Construction Scheduling contractors in Texas join the Procore Construction Network?

The Procore Construction Network is free and open to any businesses in the construction industry. Click Sign Up at the top of this page to submit your information and create your business page.

How do I know what areas Construction Scheduling contractors in Texas cover?

Most businesses listed on the Procore Construction Network have updated their service area. Select a business to view a service area map and find what other areas they work in.

How do I invite Construction Scheduling contractors in Texas on the Procore Construction Network to bid on projects?

The Procore platform offers a Bidding tool to Procore customers. If your company uses our Bidding solution, you can search and invite businesses on the Procore Construction Network directly from the Bidding tool. Not yet using Procore? Request a demo.